天津11选5走势图

山东优泉保温建材有限公司
地址:齐河县焦庙镇小李村西邻
联系人:卢经理
电话:0531-87266820
传真:0531-87266820
邮箱:390062028@qq.com
网址:
当前位置:首页 - 新闻动态
新闻动态
详解挤塑板的施工要点!
作者:admin 来源:本站 发布时间:2018-11-29 10:26:46 浏览次数:170
挤塑板作为建筑保温材料的一种在施工过程中得到的广泛的使用,但是有很多人对于施工过程还不是很了解,挤塑板厂家为您介绍施工要点。
As a kind of building thermal insulation material, extruded board has been widely used in the construction process, but many people are not very familiar with the construction process. The extruded board manufacturer will introduce the main points of construction for you.
在倒置式的施工过程中,在屋顶封顶之后需要做地面的整平处理,如果屋顶的面积较小,挤塑板之间不需要做填缝处理,当屋顶面积较大时可以在板间贴上封箱胶带,防止保护层不被砂浆固化而出现裂缝。在进行屋面的防水作业时,要确认防水层已经固化,不论是哪种施工方法和工艺都可以使用挤塑板配合施工,挤塑板在铺设时不需要进行粘合处理,不过如果使用沥青作为粘合剂,因为沥青中含有甲苯,挥发完毕后才可进行下一步的施工。
In the inverted construction process, after roof sealing, the ground leveling treatment is needed. If the roof area is small, there is no need for filling between the extruded panels. When the roof area is large, box sealing tape can be affixed between the panels to prevent cracks in the protective layer from being solidified by mortar. In the waterproofing operation of roof, it is necessary to confirm that the waterproofing layer has been solidified. No matter which construction method or process, the extruded board can be used to cooperate with the construction. The extruded board does not need to be bonded when it is laid. However, if asphalt is used as an adhesive, because the asphalt contains toluene, it can be volatilized before proceeding down. One step construction.
挤塑板厂家提醒您浇筑的保护层可分为铺设水泥砂浆内加钢筋可上人屋顶,和采用干铺卵石、人造草皮铺设的不可上人屋顶,存在很大差别的,在使用挤塑板时一定要看仔细啊。

The Extrusion board manufacturer reminds you that the protective layer can be divided into the laying of cement mortar with steel bars on the roof, and the laying of dry pebbles, artificial turf on the roof, there is a big difference, when using the extrusion board, we must look carefully.

从目前看来挤塑板在我们现在的生活中应用的地方越来越广泛,为了保障挤塑板厂家的产品在使用的时候不出现什么问题,挤塑板厂家下面会做详细的讲解,告诉大家以后应该如何去做。
At present, it seems that Extrusion board is more and more widely used in our life. In order to ensure that the products of Extrusion board manufacturers do not appear any problems in use, the Extrusion board manufacturers will give a detailed explanation below, telling you how to do it in the future.
在安装前需要做好基底的清理工作,例如像浮灰、浮土、油污等赃物,关于物料搅拌也是在安装过程中很重要的一个环节,其中干粉和水 的比例大约为5:1,当然也可以根据砂浆的粘度和当地气温作适量的调整,然后进行充分搅拌3分钟,静置5-10分钟后再搅拌2分钟就可以 用来粘贴保温板了。搅拌好的砂浆要在2个小时内用完,涂抹时砂浆面积不小于总面积的30%,2天之后才能进行下一道工序。由于挤塑板的防潮、防水性能,可以挤塑板放在基层之下,减少基础由于冰霜想、影响出现的地面冻胀现象。
Before installation, we need to do a good job of cleaning the base, such as floating ash, floating soil, oil and other stolen goods. Material mixing is also an important part of the installation process, in which the proportion of dry powder and water is about 5:1. Of course, we can also make appropriate adjustments according to the viscosity of mortar and local temperature, and then make full use of it. Stir for 3 minutes, let it stand for 5-10 minutes, then stir for 2 minutes to paste the insulation board. Mixed mortar should be used up in 2 hours. The area of mortar should be no less than 30% of the total area when smearing. The next process can be carried out after 2 days. Because of the moisture-proof and waterproof properties of the extruded board, the extruded board can be placed under the base to reduce the ground frost heave phenomena caused by frost.

友情链接:博九彩票官网  大无限彩票  传奇彩票  大无限彩票  大无限彩票  传奇彩票  

免责声明: 本站资料及图片来源互联网文章,本网不承担任何由内容信息所引起的争议和法律责任。所有作品版权归原创作者所有,与本站立场无关,如用户分享不慎侵犯了您的权益,请联系我们告知,我们将做删除处理!